Preferred levee building practices:
1920 suggested sections(Merritt)
Note tile drain and controlled borrow digging (depth limited to 6 ft)
Dont follow meanders(Pickels), prefer to flank floodplain and keep off pervious soils (1946 Transactions)
carefully inspect foundation
clear unsuitable material
dig an inspection trench to cut off sand layers, fill with clay (muck ditch)
add a toe drain
dont use old non-levee embankments
to improve older levees, add a toe drain/berm (State design)